IEEE/ICC Minutes Index Spring 1947 to Spring 1999

Presentation Title

Author(s) Affiliation Date Location Appndx Keywords
Installation of 138KV Quartz Epoxy Joint on Consolidated Edison System

Gillette, R. Consolidated Edison 68S Detroit, MI F-2 Joint 138kV
Shield Resistance at Room Temperature and Temperature Rise of Cable Shielding During Short Circuits

68S Detroit, MI III-A Shielding Electric-characteristics
Damage to a 230 KV Cable During Pulling

Mangrum, W. ICC 68S Detroit, MI VII-B Failure-cable Pulling
Stability of Materials Currently Being used in URD Transformer Enclosures and Below Grade Cable Splicing

Andrews, G. Narragansett Elec 68S Detroit, MI XI-B Comments URD
Direct Buried Feeder Cables

Fowler, W. ComEd 68S Detroit, MI VII-A Cable-buried
Trip with Members of ERC Underground Transmission Research Committee

Brookes, A. 68F New York, NY F-1 Research Transmission
Experience with Submarine Pipe Cable at Florida Power & Light Co.

Florida P&L 68F New York, NY F-2 Pipe Type Submarine
Joint Trenching Practices in Southern California

Blankenburg, R. So. Cal Edison 68F New York, NY XI-B Joint-trench Practice
230 KV Pipe Cable Failure

Adams, G. Niagara Mohawk 68F New York, NY VII-C Failure-cable Pipe Type
Failure of 69KV Elastomer Terminator and Cable Assembly

Arizona Pub Serv 68F New York, NY VII-A Failure-termination 69kV
Notes on Conversion

68F New York, NY VII-B Conversion
Proposed Changes in the National Electrical Safety Code to Cover Reduced Conductor Spacing

68F New York, NY IX-A NEC
New Ideas for Duct Systems

Smith, B. Virginia Elec & Pwr 68F New York, NY XI-A Conduit

Tuesday, January 24, 2006 How to Buy Copies of ICC Minutes Page 118 of 166


First Previous Next Last