IEEE/ICC Minutes Index Spring 1947 to Spring 1999

Presentation Title

Author(s) Affiliation Date Location Appndx Keywords
Insulating Requirements of Cable Sheath Jackets Report of Task Group 6-3

Johnson, J. ICC 65F Philadelphia, PA VI-B Jacket Sheath
Cable Duct Task Force 9-19 Duct Specification-Tentative

Higgenbottom, R. 65F Philadelphia, PA IX-B Conduit Standard
Further Comments on Sardinia-Corsica-Toscana

Palandri, G. 65F Philadelphia, PA XIIIB Submarine Report-european
Coefficient of Friction

Ralston, P. Ontario Hydro 65F Philadelphia, PA VI-D Pulling
Circuit Miles of High Pressure Pipe Type Cables in the Western Hemisphere

65F Philadelphia, PA VII-A Pipe Type
Report of Spacer Cable Performance

Gill, J. Public Service E&G 65F Philadelphia, PA IX-C Aerial-cable
120KV Pipe Type High Pressure Gas Filled Cable Termination Failures on the Detroit Edison System

Godoshian, A. Detroit Edison 65F Philadelphia, PA F-1 Failure-termination Gas-Filled
Report on Cable Damage During Installation of 138 KV High Pressure Oil Pipe Cable

North, C. Philadelphia Elec. 65F Philadelphia, PA F-2 Pipe Type Failure-cable 138kV
Test on Corrugated Steel Tubing with PVC Jacket

Grosser, E. ComEd 64S St. Louis, MO VI-B Jacket Tubing Pipe Type
Florida Power & Light Co.-Experimental Aerial Cable Installations

Thue, W. Florida P&L 64S St. Louis, MO III-A Aerial-cable
Report of Task Group on Project 6-3-Insulation Requirements of Cable Sheath Jackets

ICC 64S St. Louis, MO VI-A Jacket Sheath-cable
Cable Design for High Ambient Locations

Feller, R. 64S St. Louis, MO IX-A Thermal
Report of Activities ASTM Committee D-27 Electrical Insulating Liquids and Gases

Parker, J. ICC 64S St. Louis, MO XII-A Liquids Insulation ASTM

Tuesday, January 24, 2006 How to Buy Copies of ICC Minutes Page 126 of 166


First Previous Next Last