| IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
The Sheath as a Factor in Permissible Stresses |
| Corry, A. Geary, E. | Boston Edison | 59F | New York, NY | VI-B | Sheath Pulling |
Installation of 34KV Aerial Gas Pressure Aluminum Sheath Cable |
| Kenyon, W. | Rochester Gas & Elec | 59F | New York, NY | F-8 | Aluminum-sheath Aerial-cable Gas- |
| Filled |
Pipe-Type Cable Failure |
| Thue, W. | Florida P&L | 59F | New York, NY | F-5 | Pipe Type Failure-cable |
Vertically Supported Cables |
| Everest, G. | Okonite | 59F | New York, NY | XI-C | Suspension-support |
Short Circuit Testing of Roeclamps with Associated Cables |
| Shackford, C. | 59F | New York, NY | F-6 | Aerial-cable |
Philadelphia Electric Company Leakage Current Tests |
| Schifreen, C. | Philadelphia Elec. | 59F | New York, NY | VI-A | Corrosion Coverings |
Accidental Tapping of 138KV High Pressure Oil-Filled Cable Pipe in New York |
| Gillette, R. | Consolidated Edison | 59F | New York, NY | F-4 | Pipe Type 138kV |
Precast Vaults and Manholes |
| Blankenburg, R. | So. Cal Edison | 59F | New York, NY | XI-D | Manhole |
Experimental Aerial Cable Installations at Florida Power & Light Company |
| Thue, W. | Florida P&L | 59F | New York, NY | III-B | Aerial-cable |
Activities of EEI-Bell System Joint Subcommittee to Study Buried Distribution Systems |
| Cronin, L. | Ebasco Services | 59F | New York, NY | F-7 | Joint-trench Cable-buried |
Sequence Impedance of Pipe Type Cable |
| Thomas, E. | Consolidated Edison | 58S | Miami Beach, FL | 5 | Electric-characteristics Pipe Type |
Use of Liquid Thermosetting Resins for Splicing & Terminating |
| Boilmeier, E. | 3M | 58S | Miami Beach, FL | 13 | Joint Termination |
| Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 144 of 166 |