IEEE/ICC Minutes Index Spring 1947 to Spring 1999

Presentation Title

Author(s) Affiliation Date Location Appndx Keywords
A 34.5 KV Polyethylene Insulated Cable Installation

Ware, P. Simplex 58F New York, NY F-A Installation 35kV
Arcing Fault Task Group Minutes of Fifth Meeting

Weed, L. Boston Edison 58F New York, NY X-B Failure-cable Network
Minimum, Maximum and Mean Impulse Breakdown Gradients

Dawes, C. Crowdes, G. Simplex 58F New York, NY III-B Impulse-cable Voltage-impulse
Arcproofing of Underground Cables in the Baltimore Gas and Electric Company System

Rueckert, J. Baltimore G&E 58F New York, NY VI-C Arc-proofing
Notes on Jointing and Terminating Practices for Aluminum Sheath Cables

Croft, P. Short, H. Canada Wire & Cable 57S Boston, MA 11 Joint Termination Aluminum-sheath
Specifications for Oil

Schifreen, C. Detroit Edison 57S Boston, MA 4 Oil Standard
Protective Jackets for Outside Plant Lead and Aluminum Sheath Power Cable

NACE 57S Boston, MA 6 Corrosion Jacket Aluminum-sheath

Lead-sheath
Trial of Coal Tar Coating on Steel Pipe

Betzer, C. ComEd 57S Boston, MA 7 Coverings Pipe Type
Construction of Thermal Resistivity Probe

ICC 57S Boston, MA 12 Thermal Soil-resistivity
Laboratory Tests of Cable Arc-proofing Materials

Bechet, K. Corry, A. Boston Edison 57S Boston, MA 10 Arc-proofing
Construction of Thermal Resistivity Probe Variations Adapted by Detroit Edison

Detroit Edison 57S Boston, MA 13 Thermal Soil-resistivity
325KV Aluminum Cable Installation

Johnson, J. Philadelphia Elec. 57S Boston, MA 9 Aluminum-conductor Aluminum-sheath

Installation

Tuesday, January 24, 2006 How to Buy Copies of ICC Minutes Page 147 of 166