| IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
Mountainside Cable Installation |
| Blankenburg, R. | So. Cal Edison | 56F | New York, NY | 15 | Installation Practice-cable |
Discussion--A Further Examination of Protective Coverings for Metallic Sheathed Cables for Pipes |
| Hollingsworth, P. | BICC | 56F | New York, NY | 21 | Coverings |
The Cross Channel Project |
| Laborde, M. | Elec de France | 56F | New York, NY | 17 | Installation Report-european |
Aerial Cable Test Installation |
| Thue, W. | Florida P&L | 56F | New York, NY | 5 | Aerial-cable Installation |
Oil filled Cables and Accessories Installed in Europe and in Other Countries |
| Palandri, G. | Pirelli | 56F | New York, NY | 25 | Oil-filled-cable Report-european |
Adequacy of ASTM Test Methods for Cable Oils |
| Parker, J. | Memphis Light & Gas | 56F | New York, NY | 9 | Oil |
Aerial Cable Installation |
| Westphal, R. | Consumers Power | 56F | New York, NY | 6 | Aerial-cable |
Pre-Spun Cable Installation Novel Method of Aerial Construction |
| Chen, M. | Duquesne Light | 55S | Cleveland, OH | 22 | Aerial-cable Installation |
Rerouting of 120KV High-Pressure, Gas-Filled Cables |
| Komives, L. | Detroit Edison | 55S | Cleveland, OH | 19 | Gas-Filled Transmission |
Freezing Low Pressure, Gas Filled Cable |
| Brookes, A. | Public Service E&G | 55S | Cleveland, OH | 23 | Gas-Filled |
Report of ASTM Committee D-9 Cable Oil |
| Parker, J. | Memphis Light & Gas | 55S | Cleveland, OH | 9 | Insulation Oil |
Anti-Corrosion Coverings for Underground Structures |
| Farnham, D. | Hydro Quebec | 55S | Cleveland, OH | 11 | Corrosion Jacket |
Definitions Project 2-1 |
| ICC | 55S | Cleveland, OH | 5 | Term Standard Definitions |
| Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 151 of 166 |