| | IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| | Presentation Title |
| | Author(s) | Affiliation | Date | Location | Appndx | Keywords |
| Discussion of Troubles on 138KV cable System |
| | Gillette, R. | Consolidated Edison | 54F | New York, NY | 24 | Transmission Pipe Type 138kV |
| Corrosion of Armored Submarine Cables in Baltimore Harbor |
| | Rueckert, J. | Consolidated G&E | 54F | New York, NY | 9 | Submarine Corrosion |
| Proposed Addition Definitions of Electrical Terms Group 35 Generation, Transmission, and Distribution--Section 80 |
| | IPCEA | 54F | New York, NY | 4 | Standard Term |
| Some Notes on European Cable Practices |
| | Halperin, H. | ComEd | 54F | New York, NY | 23 | Report-european Practice |
| Impregnating Oils for 400 KV Oil-impregnated Paper Cables |
| | Wyatt, K. | Habershaw Cable Div. | 54F | New York, NY | 5 | Oil-filled-cable Transmission |
| Performance of 15KV Paper Insulated Cable in Ducts on the Philadelphia Electric Co. System |
| | Johnson, J. | Philadelphia Elec. | 54F | New York, NY | 27 | Performance PILC |
| Bibliography of Insulated Conductors Project 2-3 |
| | Fogg, L. | 53S | Pittsburgh, PA | 4 | Publication |
| 138KV Athenia-Bergen Pipe Type Cable Circuit Tests, AC/DC Ratio, Positive Sequence Reactance, Zero Sequence Imp. |
| | Brookes, A. | Public Service E&G | 53S | Pittsburgh, PA | 5 | Pipe Type Test |
| Study of Soil Thermal Resistivity Project 3-17 |
| | Burrell, R. | Consolidated Edison | 53S | Pittsburgh, PA | 7 | Thermal Soil-resistivity |
| Ampacity a Word for Current Carrying Capacity |
| | Del Mar, W. | Phelps Dodge | 53S | Pittsburgh, PA | 6 | Ampacity Rating-cable |
| Development of Suspension Type Support for 34.5 KV Cable |
| | Andrews, M. | Los Angeles Dept Pwr | 53S | Pittsburgh, PA | 14 | Suspension-support 35kV |
| Statement on Rubber Sandwich Protection for Cables Project 6-3 |
| | Sutton, C. | Enfield Cables Ltd | 53S | Pittsburgh, PA | 9 | Rubber Insulation |
| International Activities on Thermal Evaluation of Insulating Materials |
| | Berberich, L. | Westinghouse | 53S | New York, NY | 17 | Insulation Thermal |
| | Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 158 of 166 |