| IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
Thermo-Mechanical Bending Characteristics for Pipe-Type Cable Systems |
| ICC | 81S | San Diego, CA | VII-D | Pipe Type |
Comparison of Resistance Against Impact Caused by Direct Hit of Anchor |
| 81S | San Diego, CA | XIIIA | Submarine |
Listing of Cables 69 KV and Above Installed in the Western Hemisphere--Year 1979 Task Group 7-22 |
| Traut, R. | Simplex | 81S | San Diego, CA | VII-E | Installation Publication |
Performance of Extruded Dielectric Task Group 5-25 |
| 81S | San Diego, CA | V-B | Performance Plastic |
Ground-Fault and Short-Circuit Protection in Underground Coal Mines- UK Practice |
| Scott, G. | 81S | San Diego, CA | IX-B | Cable-mining Report-european |
Factors Influencing the `Shrink' Back of Cable Jackets |
| Jaczek, S. | Canada Wire & Cable | 81S | San Diego, CA | VI-A | Jacket |
ANI/MAERP Standard Fire Endurance Test Method to Qualify A Protective Envelope for Class 1E Electrical Circuit |
| Berhining, R. | UL | 81S | San Diego, CA | XIV-A | Flammability |
Semi-Flexible Mine Cable Low Tension Shield 1 KV |
| Condumex, S.A. | 81S | San Diego, CA | IX-C | Cable-mining |
Maximum Self Supporting Length--Vertical High Rise Cable |
| 81F | St. Petersburg, FL | IX-A | Riser-cable Suspension-support |
138KV Forced Cooling Test Program at Waltz Mill Typical Data and Cable Configurations |
| 81F | St. Petersburg, FL | III-A | Forced-cooling Research 138kV |
Water Jet Concrete Cutter EPRI Project RP7860 |
| EPRI | 81F | St. Petersburg, FL | F-2 | Research Trench |
EPRI/USI Cable Testing Project |
| 81F | St. Petersburg, FL | V-A | Research |
ASTM-Standard Metric Sizes of Electrical Conductors |
| ASTM | 81F | St. Petersburg, FL | IX-C | Metric |
| Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 87 of 166 |