| IEEE/ICC Minutes Index |
| ID | | Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
| 115 | | Fire Hazard Study----HS-6 |
| NFPA | 69S | Anaheim, CA | IX-B | Flammability |
| 116 | | Plastic Conduit-Comparison of Specifications |
| 71S | Montreal, Canada | XI-B | Conduit Standard |
| 117 | | Guide for Test Procedure for Determining Partial-Discharge Extinction Level Publication T-24-380, 1972 |
| IPCEA | 72F | New York, NY | XII-A | Test Ionization |
| 118 | | Sheath Currents in Underground Distribution Cable Systems |
| 70S | New Orleans, LA | III-A | Sheath Rating-cable |
| 119 | | Preliminary Proposed Shield Performance Test Project 10-39 |
| ICC | 72F | New York, NY | X-B | Shielding |
| 120 | | List of Conduit Specifications |
| 71S | Montreal, Canada | XI-A | Conduit Standard |
| 121 | | Minutes of Meeting Held During Winter Meeting of IEEE Power Engineering Society. Task Group 6-7 |
| ICC | 72S | Pittsburgh, PA | VI-B | Comments |
| 122 | | Report of Project of Project 5-27:Cryogenic Cable Insulation |
| ICC | 73S | Denver, CO | V-B | Cryogenic |
| 123 | | Minutes of Meeting Held During UTC / ICC at Pittsburg, PA May 24, 1972 |
| ICC | 72S | Pittsburgh, PA | VI-C | Comments |
| 124 | | Casing Installation Methods-IEEE ICC Open Forum-Denver, April 10, 1973 |
| 73F | Atlanta, GA | F-1 | Tunnel Installation |
| 125 | | Report of Survey-conduit Materials ICC Project 11-18 |
| 69S | Anaheim, CA | XI-A | Conduit Practice |
| 126 | | Plastic Conduit-Comparison of Specifications (Dimensions & Requirements for 4 |
| 71F | Miami, FL | XI-C | Conduit |
| 127 | | RP 78 Installation Methods Working Group |
| ICC | 72S | Pittsburgh, PA | VII-A | Installation |
| Tuesday, January 17, 2006 | http://www.ewh.ieee.org/soc/pes/icc/ | Page 10 of 166 |