IEEE/ICC Minutes Index

ID
Presentation Title

Author(s) Affiliation Date Location Appndx Keywords

2021
A Fully Submersible Transformer for URD Construction

Chaaban, M. Hydro Quebec 98F St. Petersburg, FL B(10)1 Transformer URD

2022
Implicaation of New Cable Diameter in the ICEA Std. On Premolded Cable Accessories vs. Old AEIC Diameters

Stepniak, F. Elastimold 98F St. Petersburg, FL B(10)2 Specifications ICEA

2023
Brief summary of CIGRE group 21 meeting on 1st. September 1998 in Paris

Boone, W. Kema 98F St. Petersburg, FL C(13)1 Transmission Report-european

2024
Manufacturing Long Cable Lengths Without Factory Joints

Torok, W. Fujikura 98F St. Petersburg, FL C(13)2 Transmission Report-asian

2025
420kV Submarine caable Installation at Waterdepth 850m.

Rimereit, R. Alcatel 98F St. Petersburg, FL C(13)3 Transmission Report-european

Submarine

2026
High Voltage Solid Dielectric Cables in New Applications

Carstensen, P. Leijon, M. ABB 98F St. Petersburg, FL C(13)4 Transmission Report-european

Generation

2027
220kV XLPe Cable Installation in Barcelona Spain

Watkins, R. BICC 98F St. Petersburg, FL C(13)5 Transmission Report-european XLPe

2028
Installation of 230kVXLPe Cables at Morrow Point Power Station, Colorado

Meier, A. Zemke, R. Brugg 98F St. Petersburg, FL C(13)6 Transmission 230kV XLPe

2029
First 440kV Prefabricated Joint Installed in Switzerland

Meier, A. Brugg 98F St. Petersburg, FL C(13)7 Transmission 400kV Joint

2030
Submarine Power Cable Repair Operation at Water Depth 250m.

Rimereit, R. Alcatel 98F St. Petersburg, FL C(13)8 Transmission Submarine Repair

2031
Underground Link in Bulgaria

Alcatel 98F St. Petersburg, FL C(13)9 Transmission Report-european 400kV

2032
Combustion Gas Measurement of Wire and Cable using UL 1685

Groeger, J. Altran Materials 98F St. Petersburg, FL C(3)1 Gas EPR Testing

Tuesday, January 17, 2006 http://www.ewh.ieee.org/soc/pes/icc/ Page 160 of 166