IEEE/ICC Minutes Index

ID
Presentation Title

Author(s) Affiliation Date Location Appndx Keywords

271
Factors to be Considered in Cable Design for up to 25KV Single Conductor Underground Application

80S Philadelphia, PA IX-A Cable-buried URD

272
ICC Task group 5-25 Minutes and Glossary of Treeing Terms Task Group 5-25

ICC 78S San Francisco, CA V-C Treeing Term

273
Failure of Joint No. 1 On Sample No. 26-2, 138 KV XLP Cable, Waltz Mill Test Site

Pirelli 80S Philadelphia, PA V-B Failure-cable Research 138kV

274
138-550 KV PPP-Insulated Pipe Type Cable

EPRI 81F St. Petersburg, FL V-B Pipe Type Research Tape

275
HN 33-5-33 Cable Construction French Design Hydroscopic Powder

83S Memphis, TN III-E Report-european

276
Performance of Extruded Dielectrics Task Group 5-25

ICC 81F St. Petersburg, FL V-C Performance Plastic

277
MIL-C-915 F Supplement I; Cable and Cord Electrical for Shipboard Use

83S Memphis, TN IX-A Standard

278
Proposed Guidelines and Standards Toward Achieving Optimum Serv. Reliability and Cost-effectiveness Underwater

Cable

82F St. Petersburg, FL IX-B Submarine

279
Cable Jacket

Phelps Dodge 82F St. Petersburg, FL XII-B Jacket

280
Cable Jacket Resistivity (Aged in Water)

81F St. Petersburg, FL XII-A Jacket

281
Status of Waltz Mill Solid Dielectric Test Samples

80F St. Petersburg, FL V-A Research

282
Clamping Techniques for Armored Cables

O.Z. Electric 81S San Diego, CA IX-A Armored-cable Suspension-support

283
The Effect of LOCA Simulation Procedures on Ethylene Propylene Rubber's Mechanical & Electrical Properties

83F Toronto, Canada V-H Rubber Insulation

Tuesday, January 17, 2006 http://www.ewh.ieee.org/soc/pes/icc/ Page 22 of 166
First Previous Next Last