IEEE/ICC Minutes Index

ID
Presentation Title

Author(s) Affiliation Date Location Appndx Keywords

323
Not Titled

87F

324
Virginia Power Cable-in-Conduit (CIC) Five Year Extended Warranty

Virginia Elec & Pwr 86S Knoxville, TN V-D Conduit CIC

325
Elbow Puller Tool Developed By Ontario Hydro

Ontario Hydro 85S St. Louis, MO X-A Accessories Termination

326
Fischer Report on Properties on Various Polyolef in Jacketing Materials - Project 6-23

84F St. Petersburg, FL VI-A Jacket Polymer

327
Water Permeation Rate-Method of Test Piece Preparation and Measurement

British PO Tel 84S Baltimore, MD III-A Moisture Standard

328
Summary of Dielectric Test Requirements

86S Knoxville, TN V-A Standard

329
List of Projects-------Sub Committee No. 12 Tests and Measurements

ICC 85F St. Petersburg, FL XII-A Standard Publication

330
Report of Cable Failures, Duke Power Co

Duke Power 85F St. Petersburg, FL V-B Failure-cable

331
UL Services Available

UL 84S Baltimore, MD IX-A UL

332
Premolded Joints for Extruded Insulation Cables in the range 138KV-300KV A.C.

87F St. Petersburg, FL V-D Joint Premolded Report

333
Glossary of U.L. Terms

UL 84S Baltimore, MD IX-B Term UL

334
Leak Detection on HPOF Cable

87F St. Petersburg, FL III-F Project EPRI HPOF

335
Survey of Gas Handling Procedures & Moisture Checks for Gas Insulated Substations (GIS) Gas Insulated Bus

(CGIC)

ICC 84S Baltimore, MD V-A Practice Gas-Filled Cable-station

Tuesday, January 17, 2006 http://www.ewh.ieee.org/soc/pes/icc/ Page 26 of 166