| IEEE/ICC Minutes Index |
| ID | | Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
| 489 | | Hawaii Deep Water Cable Program Manufacture of the Full Size Test Cable |
| Bionchi, G. | 87F | St. Petersburg, FL | VII-B | Oil-filled-cable DC 300KV |
| 490 | | Cable Project Activities in Norway |
| Bjorlow-Larsen, K. | 89F | St. Petersburg, FL | XIII-C | DC-cable Report-asian |
| 491 | | Submarine Cable |
| Bjorlow-Larsen, K. | STK | 85F | St. Petersburg, FL | XIIIA | Submarine Report-european |
| 492 | | Update on Cable Projects |
| Bjorlow-Larsen, K. | Kabelfabrik A/S | 86F | St. Petersburg, FL | XIIID | Report-european |
| 493 | | The CAPJET System |
| Bjorlow-Larsen, K. Gilbertson, O. | 89F | St. Petersburg, FL | F-1 | Submarine Installation |
| 494 | | Mass Impregnated HVDC Cables |
| Bjorlow-Larsen, K. | Kabelfabrik A/S | 84F | St. Petersburg, FL | XIIIB | Submarine Report-european |
| 495 | | Simplified Thermal Stability Model for Soils Surrounding Underground Cable Systems |
| Black, W. Hartley, J. | Georgia Tech | 84F | St. Petersburg, FL | F-4 | Thermal Soil |
| 496 | | Strand Design Using A Single Input Wire Diameter |
| Blackmore, A. | Ceeco Group | 90F | St. Petersburg, FL | IV-A | Conductor |
| 497 | | Mountainside Cable Installation |
| Blankenburg, R. | So. Cal Edison | 56F | New York, NY | 15 | Installation Practice-cable |
| 498 | | Precast Vaults and Manholes |
| Blankenburg, R. | So. Cal Edison | 59F | New York, NY | XI-D | Manhole |
| 499 | | Residential Underground Cost Comparsions -Influence of Pri.Voltage & Transformer Spacing on Relative Cost per Lot |
| Blankenburg, R. | So. Cal Edison | 60F | New York, NY | F-1 | URD |
| 500 | | Lower Cost Distribution System |
| Blankenburg, R. | So. Cal Edison | 61F | New York, NY | VII-A | Performance Practice |
| 501 | | Plowing-In Submarine Cable |
| Blankenburg, R. | So. Cal Edison | 61F | New York, NY | F-7 | Submarine |
| Tuesday, January 17, 2006 | http://www.ewh.ieee.org/soc/pes/icc/ | Page 39 of 166 |