A presentation "Directional Drilling Installation of 115 kV XLPE Cable at Santee Cooper" was given by Isaac Green, Santee Cooper and Torben Aabo, Power Cable Consultants. The presentation is included as Appendix 7-D. A presentation "Alternate Cable Systems for Uprating BC Hydro 230 SCFF Circuits" was given by Tony Ernst, Underground Systems, Inc. This presentation is included as Appendix 7 - C.