Insulated Conductors Committee

The ICC Website is changing.  As this transition is made, our new format can be found at www.pesicc.org/ICCWP. Please send any comments or questions to mvh@voncorp.com.

Subcommittee 7


INACTIVE

Officers

Scope:

Systems of insulated conductors and their required facilities for the transport of electric power. Included are the design; installation; operation, repair and preventative maintenance for distribution and transmission. Also included are studies of cable movement, pulling tensions, sidewall pressures, performance and the economics of various types of systems.

Mission Statement:

The Cable Supply Subcommittee's mission is to continually advance the technical understanding of the design, installation, operation, failure mechanisms and repair of transmission and distribution cable systems on an international basis in order to promote the most effective use of power cable systems.

Working Groups

In the Winter of 1998, SC 7 was inactivated as a part of the ICC reorganization. It's Working Groups were reassigned as follows:

SC-7 Minutes

Return to the ICC Subcommittee page

Return to the ICC Homepage

IEEE prohibits discrimination, harassment and bullying. For more information, visit ieee.org/web/aboutus/whatis/policies/p9-26.html
Privacy & Opting Out of Cookies  Terms & Conditions
IEEE ICC PES & Design is a registered trademark of The Institute of Electrical and Electronics Engineers, Inc.

IEEE-ICC-PES