| IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
NEMA Plastic Conduit and Duct Standards |
| 75S | Baltimore, MD | XI-B | Standard Conduit NEMA |
Precast Hex Service |
| 75S | Baltimore, MD | XI-C | Manhole |
Life and Type Tests on Pirelli Self-contained Oil Filled Cables at 750 KV |
| Morello, A. | Pirelli | 75S | Baltimore, MD | V-B | Oil-filled-cable Transmission |
Revisions to ANSI C119.2 Standards for Separable Insulated Connectors |
| Westrom, A. | 75S | Baltimore, MD | F-1 | Standard Accessories |
Guide for Selecting & Testing of Protective Jackets for Underground Power Cables |
| ICC | 75S | Baltimore, MD | VI-A | Jacket |
Liaison Report on Cable in National Electric Safety Code |
| Lee, R. | 75S | Baltimore, MD | L-1 | Standard Report-liaison NEC |
HVDC Stress Constant and Equations Project 5-26 DC Insulation -Task Group 5-26 |
| ICC | 75S | Baltimore, MD | V-E | Insulation Stress |
Listing of Cable 69KV and Above in Western Hemisphere |
| 75F | Birmingham, AL | VII-A | Transmission Publication 69kV |
Cable Arc and Fireproofing Task Group 6-7 |
| ICC | 75F | Birmingham, AL | VI-E | Fire-proofing |
Guide for Selecting and Testing of Protective Jackets for Underground Cable Project 6-3 |
| ICC | 75F | Birmingham, AL | VI-A | Jacket |
Liaison Report to ICC from NACE on Pipe Coating and Pipe Protection |
| Sloan, R. | H.C. Price | 75F | Birmingham, AL | L-1 | Pipe-coating Report-liaison |
NACE Corrosion `75' Toronto, Canada, April 1975 |
| NACE | 75F | Birmingham, AL | VI-D | Corrosion Report-liaison |
Properties of Aluminum Sheaths by IEEE Power Engineering Society |
| 75F | Birmingham, AL | VI-C | Aluminum-sheath |
| Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 101 of 166 |