| IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| Presentation Title |
| Author(s) | Affiliation | Date | Location | Appndx | Keywords |
Submarine Cable Failure Due to Armor Corrosion Open Forum 11-19-75 |
| Waldron, R. | Okonite | 75F | Birmingham, AL | F-2 | Submarine Failure-cable |
Polypropylene For Electrical Insulation |
| Moore, E. | Hercules Inc | 75F | Birmingham, AL | V-A | Insulation Plastic |
Liaison Report to ICC from Nuclear Power Engineering Committee (NPEC) SC-2 (Qualification) |
| Garshick, A. | Boston Ins Wire | 75F | Birmingham, AL | L-3 | Joint Connector Report-liaison |
Guide for Selection and Design of Aluminum Sheath |
| ICC | 75F | Birmingham, AL | VI-B | Aluminum-sheath |
Suggested Casing Diameter for Pipe Cable Systems |
| 75F | Birmingham, AL | IX-A | Conduit Pipe Type |
Performance of Extruded Dielectric Insulating Materials |
| Blodgett, R. | 75F | Birmingham, AL | V-B | Insulation |
The Transient Temperature Rise of Round Wire Shields of Extruded Cables under Short Circuit Condition |
| Martin, M. Reczek, A. | Georgia Power | 75F | Birmingham, AL | F-1 | Temperature-cable Shielding |
Liaison Report to ICC from Power Generating Group on Guide for Design and Installation of Cable in Power Gen Sta. |
| Gardner, J. | Kerite | 75F | Birmingham, AL | L-5 | Cable-station Report-liaison |
Liaison Report to ICC from IEEE Industry Application Society Industrial and Commercial Power Systems Committee (ICPS) |
| Lee, R. | E.I. DuPont | 75F | Birmingham, AL | L-2 | NEC Report-liaison |
Liaison Report to ICC from ASTM D-9 |
| Perkins, J. Curdts, E. | ASTM | 75F | Birmingham, AL | L-4 | Standard Report-liaison |
Cryogenic Cable Insulation Task Force 5-27 |
| ICC | 75F | Birmingham, AL | V-C | Cryogenic |
DC Insulation Task Group 5-26 |
| 74S | Niagara Falls Canada | V-E | Insulation |
Honshu-Hokkaido D.C. Inter-Tie |
| Nakano, H. | Furukawa | 74S | Niagara Falls Canada | V-H | DC-cable Report-asian |
| Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 102 of 166 |