The ICC Website is changing. As this transition is made, our new format can be found at www.pesicc.org/ICCWP. Please send any comments or questions to mvh@voncorp.com.
This Activity Schedule is Preliminary and subject to change
- The Final Schedule will be available at the meeting -
TIME |
Group No. |
Activity |
Chairs |
Room |
8:00 AM |
|
Cable Construction and Design
Subcommittee Session A |
Tanaka/Srinivas |
Ballroom
|
5-25 5-29 5-30 5-31 12-35 |
Performance of Extruded Dielectrics Characteristics of Semiconductive Shields Characteristics of Insulating Materials Definition of Tree Retardant Crosslinked Polyethylene Accelerated Electrical Aging Presentations from these groups will be made in Sessions A&B |
Densley Orton/Burns Bernstein/Gafurian Hartlein/Harp Bartnikas |
|
WG/DG Meetings (separate from subcommittee meetings) |
|||
8:00 AM to 10:15 AM |
10-56 3-1 6-21 |
Guide to Select Terminations for 5-46 kV Cables Ampacity Tables Cable Neutral Corrosion |
Fulcomer Ernst Valdes |
TBA TBA TBA |
10:30 AM to 12:30 PM |
7-40 12-48 10-27 |
Network Manhole Fires Guide for Fault Location on Shielded Power Cables Revisions of IEEE 404 Joint Standard |
Groeger/Wright Gnerlich/Haverkamp Luzzi/DiGuglielmo |
TBA TBA TBA |
12:30 PM to |
Transnational Lunch |
TBA |
2:00 PM |
|
Cable Construction and Design
Subcommittee Session B Remaining Special Presentations |
Tanaka/Srinivas |
Ballroom |
|
WG/DG Meetings (separate from subcommittee meetings) |
|||
2:00 PM to 3:15 PM |
6-7 7-5 10-39 |
Guide for Appl. of Flame Retardant Blankets & Tapes Development of AC Cable Systems 60 kV and Above Revision of IEEE 592 Testing Exposed Semiconducting Shields |
Resuali/Brown Aabo/Buckweitz Makal/Rampley |
TBA TBA TBA |
3:30 PM to 5:30 PM |
11-28 14-2 5-31 |
Guide for Guided Boring Method of Installing Cable/Conduit Fiber Optic Cables Definition of Tree Retardant XLPE |
Rodenbaugh White Hartlein/Harp |
TBA TBA TBA |
Spouse Breakfast is 7:30 AM until 9:30 AM
Registration will be open:
Return to the Fall 1998 Homepage