Fall 1998 Meeting | |||||
Scope: All issues related to installation, operation and testing of cable systems. | Chairmen: Cooper and Tingley | ||||
Group | Group | Working Groups Under This Subcommittee | Chairmen | Will Have Presentations At Subcommittee Meeting?* | Will Hold a Meeting Separate From Subcommittee Meeting? |
3-1 | W | Ampacity Tables | Ernst | No | Yes |
3-51 | W | Guide for Bonding High Voltage Cable Sheaths | Buckweitz | No | Yes |
3-57 | D | Magnetic Fields of Underground Cables | Cooper/Zemyan | No | Yes |
3-58 | W | Remaining Life of Paper Insulated Trans. Cable Systems | Foty/Zimnoch | No+ | Yes |
5-28 | W | Analysis of Gases in Cable Fluids | Englehardt/Folberg | No | No |
6-7 | W | Guide for Appl. of Flame Retardant/Arc Resistant Materials | Resuali/Brown | No | Yes |
6-21 | D | Cable Neutral Corrosion | Valdes | Yes | Yes |
7-5 | W | Development of AC Cable Systems 60 kV and Above | Aabo/Buckweitz | No | Yes |
7-35 | D | Report of Cable Failures 69 kV and Above | - | No | No |
7-40 | D | Network Manhole Fires | Groeger/Wright | Yes | Yes |
9-29 | W | Submarine Cables | Turner/DiCostanzo | Yes | Yes |
11-23 | W | Guide for Dist. Cable Installation Methods in Duct Systems | Pickett | No | Yes |
11-28 | G | Guide for Guided Boring Method of Installing Cable/Conduit | Rodenbaugh | No | Yes |
12-5 | W | Revision of IEEE 82 Impulse Testing | - | No | No |
12-22 | W | DC Field Testing IEEE 400.1 | Thue | No | No |
12-50 | W | Guide for Field Testing and Evaluation of Shielded Cables | Thue/Balaska | No+ | No |
12-51 | W | Partial Discharge Testing in the Field IEEE 400.1 | Mashikian/Boone | No | Yes |
12-52 | W | Very Low Frequency Testing in the Field IEEE 400.2 | Gnerlich/Katz | No | Yes |
12-44 | W | Soil Thermal Stability | Martin | No | No |
12-48 | W | Guide for Fault Locating on Shielded Power Cables | Gnerlich/Haverkamp | No | Yes |
AdHoc | D | Superconducting Cables | Von Dollen | Yes | Yes |
SC 13 | D | Transnational Activities | Orton | Yes | Transnational Lunch |
+Working Group/Discussion Group Status Update will be provided at Subcommittee Meeting
*See the list of Special Presentations
xW = Working Group (Prepares a document such as a standard, guide or paper) D = Discussion Group (Provides a forum for discussion on a focused topic.)